版权信息

COPYRIGHT © 2018  
Jinan Huabei Lifting Platform Manufacturing Co., Ltd.

Mobile boarding bridge manufacturing process

Classification:
Industry News
Author:
Source:
2018/10/23
Page view:
Everyone knows that the manufacturing process of any machine is really similar. Today, the North China Lift Platform shares the manufacturing process of the mobile boarding bridge:
First, before the manufacture of the boarding bridge lifts, there is a need for manufacturing drawings. This is the first part. If there is no drawing, it is impossible to manufacture.
Second, we must prepare all the equipment and materials related to boarding and manufacturing. If you want to build a good mobile boarding bridge, then the preparatory work is inevitable. When all of them are ready, they will be able to start manufacturing in the future. The first step in making a boarding bridge lift is to cut the material. The material to be cut is the material required to cut the steel according to the drawings. Then it is welding. When the main frame is welded for the future, it is laid on the grid plate, and then welded, and then the device for hydraulic equipment and the device for boarding the elevator.
Third, after the equipment is realized, it is the paint of the boarding bridge lift, and then the mechanical function test, to see if it can meet the customer's request, and whether the relevant parameters can pass, if some aspects do not meet the customer's request, then Dispose of until the customer's request is satisfied and the relevant parameters pass. Finally, the shipment is made.